| Agency | Form: (02) 1757000 08/24/2009 | <style type="text/css">
p {margin:0px 0px 0px 2px;}
ul {margin-top:2px;margin-bottom:2px;}
ol {margin-top:2px;margin-bottom:2px;}
H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
.Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;}
.TableDefault {border-collapse:collapse;border:1px solid #000000;}
.TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
.TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
</style>
<p><span class="Normal">1) PROVIDE 24 HR NOTICE OF SPUD TO ED BINKLEY AT 970-506-9834 OR E-MAIL AT </span><span class="Normal">ED.BINKLEY@STATE.CO.US . 2) SET SURFACE CASING TO 750' MINIMUM, PER RULE 317D, </span><span class="Normal">CEMENT TO SURFACE. SETTING SURFACE CASING LESS THAN THE APPROVED DEPTH IS A </span><span class="Normal">PERMIT VIOLATION UNLESS PRIOR WRITTEN APPROVAL IS OBTAINED FROM THE COGCC. 3) IF </span><span class="Normal">COMPLETED, PROVIDE CEMENT COVERAGE FROM TD TO A MINIMUM OF 200' ABOVE NIOBRARA. </span><span class="Normal">VERIFY COVERAGE WITH CEMENT BOND LOG. 4) IF DRY HOLE, 40 SKS CEMENT 50' ABOVE </span><span class="Normal">NIOBRARA TOP, 50 SKS CEMENT ½ OUT, ½ IN SURFACE CASING, 10 SKS CEMENT TOP OF </span><span class="Normal">SURFACE CASING, CUT 4' BELOW GL, WELD ON PLATE, 5 SKS CEMENT IN RAT HOLE & 5 SKS </span><span class="Normal">CEMENT IN MOUSE HOLE. RESTORE SURFACE LOCATION.</span></p>
|
| Engineer | Form: (06) 401619548 06/07/2018 | Prior to starting plugging operations a Bradenhead test shall be performed.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
3) If sampling is required contact COGCC engineering for an confirmation of plugging requirements prior to placing any plugs.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
|
| Engineer | Form: (06) 401619548 06/07/2018 | Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|
| Engineer | Form: (06) 401619548 06/07/2018 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Prior to placing the 1084’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 784’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug.
4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment is complete.
|