| Agency | Form: (02) 1904609 08/06/2009 | <style type="text/css">
p {margin:0px 0px 0px 2px;}
ul {margin-top:2px;margin-bottom:2px;}
ol {margin-top:2px;margin-bottom:2px;}
H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
.Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;}
.TableDefault {border-collapse:collapse;border:1px solid #000000;}
.TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
.TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
</style>
<p><span class="Normal">1) PROVIDE 24 HOUR NOTICE OF MIRU TO JIM PRECUP AT 303-469-1902 OR E-MAIL AT </span><span class="Normal">JAMES.PRECUP@STATE.CO.US 2) COMPLY WITH RULE 317.I AND PROVIDE CEMENT COVERAGE </span><span class="Normal">FROM TD TO A MINIMUM OF 200' ABOVE NIOBRARA AND FROM 200' BELOW SHANNON TO 200' </span><span class="Normal">ABOVE SUSSEX. VERIFY COVERAGE WITH CEMENT BOND LOG. </span></p>
<p><span class="Normal">3) COMPLY WITH RULE 321. RUN AND SUBMIT DIRECTIONAL SURVEY FROM TD TO BASE OF </span><span class="Normal">SURFACE CASING. ENSURE THAT THE WELLBORE COMPLIES WITH SETBACK REQUIREMENTS </span><span class="Normal">IN COMMISSION ORDERS OR RULES PRIOR TO PRODUCING THE WELL.</span></p>
<p><span class="Normal"> </span></p>
|
| Agency | Form: (02) 1904609 09/10/2009 | <p>Drilling pit must be lined due to shallow depth to GW (sensitive area). Form 15 submitted for location.<br />
</p> |
| Permit | Form: (05) 2554384 10/27/2010 | REQUESTED D/S PROFILE |
| Engineer | Form: (06) 402153418 11/21/2019 | Venting
Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|
| Engineer | Form: (06) 402153418 11/21/2019 | Bradenhead Testing
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
|
| Engineer | Form: (06) 402153418 11/21/2019 | Plugging
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
3) Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from COGCC is obtained.
4) The wellbore must be static prior to placing cement plugs which are to be a minimum of 100' in length for all but surface plugs. Mechanical isolation requires a 25' cement plug, minimum.
5) Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. Confirm cement to surface in all strings during cut and cap.
6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed.
7) Contact area inspector prior to commencing plugging operations.
8) Move the casing cut to 2500'. Pump 75 sx stub plug from 2500-2300'. Tag required if circulation is not maintained while pumping plug and displacing to depth.
9) Due to a history of bradenhead pressure as reported on the pre-plugging Form 17, wait 8 hours after pumping plug at 2500-2300’, in order to assure that there is no pressure or flow before proceeding with plugging procedure. If at any time after placing and sufficiently waiting on this or subsequent plugs there is evidence of pressure or of fluid migration contact COGCC Area Engineer. Additional plugs may be necessary to shut off pressure or flow prior to isloating the surface shoe.
|
| Engineer | Form: (04) 402230403 11/21/2019 | •Form 17, 402224815, P&A. 89 psig initial surface casing pressure. Down to 0 within 5 minutes. Gas sample taken.
•This well shall be plugged and abandoned by Dec 31, 2019 per operator plan. |