| Agency | Form: (02) 1713884 05/29/2009 | 1) NOTE SURFACE CASING SETTING DEPTH CHANGED FROM 1000' TO 1410'. INCREASE CEMENT COVERAGE ACCORDINGLY. 2) PROVIDE 24 HR NOTICE OF MIRU TO COLBY HORTON AT 970-370-0040 OR COLBY.HORTON@STATE.CO.US. 3) IF INTERMEDIATE CASING IS SET, CEMENT COVERAGE SHALL BE AT A MINIMUM FROM THE PRODUCTION LINER SHOE TO 200' ABOVE NIOBRARA. VERIFY ALL PLACED CEMENT WITH CEMENT BOND LOG AND CEMENTING TICKETS FOR BOTH THE PRODUCTION LINER AND INTERMEDIATED CASING. 4) COMPLY WITH RULE 321. RUN AND SUBMIT DIRECTIONAL SURVEY FROM TD TO BASE OF SURFACE CASING. ENSURE THAT THE WELLBORE COMPLIES WITH SETBACK REQUIREMENTS IN COMMISSION ORDERS OR RULES PRIOR TO PRODUCING THE WELL.
|