Engineer | Form: (06 ) 401411678 10/17/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|
Engineer | Form: (06 ) 401411678 10/17/2017 | If well is not plugged prior to February 1, 2018.
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days. |