COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401405562
9/28/2017
Note change in plugging procedure (CIBP deeper - within 100' of top perf). 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) All annular pressures should be stopped prior to placing 1500' plug. If annular pressures not stopped prior to placing 1500' plug, plug should be split into smaller plugs. Intention is to stop all pressure prior to placing shoe plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
EngineerForm: (06 )
401405562
9/28/2017
If there has not been a Bradenhead test within 60 days of plugging this well,prior to starting plugging operations a bradenhead test shall be performed. If the well was not sampled as part of a prior test it should be sampled if pressure is 25# or greater. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. The Form 17 shall be submitted within 10 days of the test.
 