Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-29642KOESTER
18-33
KP KAUFFMAN COMPANY INC
46290
SI
6/1/2024
WATTENBERG
90750
WELD  123
SWNW 33 4N67W 6
332775View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02 )
1760124
12/29/2009
1) Provide 24 hour notice of MIRU to Ed Binkley at 970-506-9834 or e-mail at ed.binkley@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
AgencyForm: (02 )
1760124
1/19/2010
Location is outside the window; exception granted
EngineerForm: (04 )
403671398
3/12/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) The additional cement referenced shall be placed as indicated and codumented with a Form 5 within 30 days of repair operations. The placed cement shall be verified with a CBL. Repair shall also be pressure tested for a minimum of 15 minutes. Pressure test and CBL shall be provided with the Form 5.
 
COGIS - Best Management Practice Results
No records to display.