Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-29640PIONEER
2-11
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
9/1/2016
WATTENBERG
90750
WELD  123
SWNE 11 2N65W 6
336492View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401014527
04/29/2016
1) Prior to starting plugging operations, a bradenhead test shall be performed. Call COGCC Engineer with the results of the test before plugging. The Form 17 shall be submitted with Form 6 (s) Subsequent of Abandonment. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Stub plug is also shoe plug, this plug must be tagged at 773’ or shallower. Leave at least 100’ cement in the casing for each plug.
 
COGIS - Best Management Practice Results
No records to display.