Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-28177PIONEER
23-12
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
8/19/2019
WATTENBERG
90750
WELD  123
SESE 12 2N65W 6
336089View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401371681
10/17/2017
1) Prior to starting repair work a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present sampling is required before pumping any cement. The Form 17 shall be submitted within 10 days of the test. 2) After completing repair work a Bradenhead Test shall be performed within the next 60 days and the Form 17 submitted within 10 days of the test. 3) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5. Submit a Completed Interval Report, Form 5A, within 30 days after a formation is temporarily abandoned.
 
COGIS - Best Management Practice Results
No records to display.