| Agency | Form: (02) 1774848 12/18/2009 | Submit updated wellbore diagram - a non 'static' diagram with annotations - static diagram with 'well table' not acceptable |
| Engineer | Form: (04) 401180122 04/28/2017 | A braden test will be performed and gas sample taken. Submit Form 17 and gas analysis to COGCC. |
| Engineer | Form: (04) 401634903 07/05/2018 | This approval is good for one year and a new application must be made before May 9, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (06) 401766170 01/17/2019 | Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. |
| Engineer | Form: (06) 401766170 01/17/2019 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|
| Engineer | Form: (06) 401766170 01/17/2019 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
3) After pumping squeeze, shut down and shut well in at minimum 8 hours; verify gas migration has been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders. |
| Engineer | Form: (04) 402063728 06/26/2019 | This approval is good for one year and a new application must be made before Juine 4, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. |