Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-25758HOUNDSKEEPER H
1-28
NOBLE ENERGY INC
100322
PA
6/27/2014
WATTENBERG
90750
WELD  123
NWNE 1 3N65W 6
336619View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400590279
4/21/2014
Note changes to plugging procedure: 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 2350' plug: pump plug and displace, shut-in. If stub plug does not circulated to surface then tag plug – must be 2150' or shallower. 3) For 950’ plug: pump plug and displace. If surface casing plug not circulated to surface then tag plug and provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug. 4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.