| Engineer | Form: (06) 401316070 07/28/2017 | Post Plugging Reporting
• Form 17 Bradenhead Test Report shall be submitted within 10 days of the test.
• File electronic Form 42 once flowline abandonment is complete.
• Submit gyro survey run on 6/1/12 with Form 6 SRA. |
| Engineer | Form: (06) 401316070 07/28/2017 | Plugging
• Provide 48 hour notice of plugging MIRU via electronic Form 42.
• Stub plug is also the surface casing shoe plug. If plug is not circulated to the surface then this plug shall be tagged. Max depth to top of stub/shoe plug is 50’ above the depth of the surface casing shoe, 669' or shallower, assuming casing is cut at 1310' as planned. If casing cannot be cut 100’ or more below the surface shoe notify COGCC Engineer for revised plans.
• Place a 25 sack plug at the surface, all other plugs shall have at least 100' of cement left in the casing.
• Properly abandon flowlines as per Rule 1103. |
| Engineer | Form: (06) 401316070 07/28/2017 | Bradenhead Testing
Prior to starting plugging operations, a bradenhead test shall be performed. If the initial shut-in bradenhead pressure is greater than 25 psi, notify COGCC Engineer for sampling requirements prior to beginning the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
|