Engineer | Form: (06 ) 401399900 10/26/2017 | 1) Provide 48 hour notice of MIRU via electronic Form 42.
2) Stub plug: Tag plug 50’ above surface casing shoe.
3) Surface plug: Cement from 50' to surface in casing and annulus.
4) Properly abandon flowlines per Rule 1103. File Form 42 when done.
5) Abandoned well marker shall be inscribed with the well’s legal location, well name and number, and API Number (Rule 319.a.5).
|
Engineer | Form: (06 ) 401399900 10/26/2017 | Bradenhead:
Prior to starting plugging operations a bradenhead test shall be performed.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
The Form 17 shall be submitted within 10 days of the test.
|
Engineer | Form: (06 ) 401399900 10/26/2017 | Venting during plugging:
Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|