Engineer | Form: (06 ) 401049336 5/17/2016 | 1) Notification waived. COGCC is involved.
2)For 996’ plug: pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours and tag plug – must be 846’ or shallower and provide minimum 10 sx plug at the surface. Leave at least 100’ of cement in the wellbore for each plug.
3)Properly abandon flowlines. Once flowlines are properly abandoned, file electronic form 42.
|