| Public Room | Form: (06) 401288697 07/18/2017 | Update production to show Jsand as producing prior to SI and then PA |
| Engineer | Form: (06) 401288697 07/27/2017 | Post Plugging Reporting
• Form 17 Bradenhead Test Report shall be submitted within 10 days of the test.
• File electronic Form 42 once flowline abandonment is complete.
• Submit gyro survey run on 5/1/14 with Form 6 SRA.
|
| Engineer | Form: (06) 401288697 07/27/2017 | Plugging
• Provide 48 hour notice of plugging MIRU via electronic Form 42.
• After pumping sqeeze at 4430' monitor well for fluid migration before moving up to cut
casing. If migration persists contact COGCC Engineer for revised plugging plans.
• Production casing stub plug is surface casing shoe plug as well. If it is not circulated to
the surface then tag the plug – must be 815’ or shallower.
• Place a 25 sack plug at the surface, all other plugs shall have at least 100' of cement
left in the casing.
• Properly abandon flowlines as per Rule 1103. |
| Engineer | Form: (06) 401288697 07/27/2017 | Bradenhead Testing
Prior to starting plugging operations, a bradenhead test shall be performed. If the initial
shut-in bradenhead pressure is greater than 25 psi, notify COGCC Engineer for
sampling requirements prior to beginning the test. Sampling shall comply with Operator
Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and
Gas Sampling. |