Engineer | Form: (06 ) 400942985 12/30/2015 | Note changes to plugging procedure:
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Move CIBP from 6980’ to 7230’ for Codell isolation; install CIBP at 6930’ with 2 sx to provide Niobrara isolation.
3) For 600’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 283’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug.
4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|