Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-22048MCLEOD
6
PDC ENERGY INC
69175
PA
1/27/2016
WATTENBERG
90750
WELD  123
CSE 29 4N66W 6
332258View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400942985
12/30/2015
Note changes to plugging procedure: 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Move CIBP from 6980’ to 7230’ for Codell isolation; install CIBP at 6930’ with 2 sx to provide Niobrara isolation. 3) For 600’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 283’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug. 4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.