COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06)
401979048
03/20/2019
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days -Missing production reporting from 10/2016
EngineerForm: (06)
401979048
04/25/2019
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
EngineerForm: (06)
401979048
04/25/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401979048
04/25/2019
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines per Rule 1105. File electronic Form 42 once abandonment of on-location flowlines complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment. 4) Submit a copy of any logs (CBL planned) run during plugging operations with Form 6 Subsequent Report of Abandonment. 5) After pumping squeeze, verify all flows have been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders.
 
COGIS - Best Management Practice Results
No records to display.