Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-21831MCDONALD
2-4 A
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
11/5/2024
WATTENBERG
90750
WELD  123
NWNE 4 3N67W 6
332097View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400879578
08/05/2015
1) Please submit form 17 for previous tests and after each new test. 2) Collect and analyze production and bradenhead gas samples for gas composition and stable isotope analysis. The stable isotope analysis should include the d13C1, d13C2, d13C3, d13IC4, d13NC4 ,d13IC5 , d13NC5, d13C6+ and dDC1. And carbon isotopes of CO2 if possible d13 CO2 and d18O CO2. In addition H2S. 3) Collect and analyze production and bradenhead hydrocarbon liquid samples for composition and stable isotope analysis. The stable isotope analysis should include the d13C1, d13C2, d13C3, d13IC4, d13NC4 ,d13IC5 , d13NC5, d13C6+ and dDC1. And carbon isotopes of CO2 if possible d13 CO2 and d18O CO2. In addition H2S. 4) Collect and anayze production and Bradenhead water samples for analysis of Volatile Organic Compounds (VOCs) via EPA Method 8260 or similar, and for Semivolatile Organic Compounds (SVOCs) via EPA method 8270 or similar. In addition, analyze the major cations and anions so that we can better make an evaluation of the source of the water. This would include Na, K, Ca and Mg for cations and sulfate, chloride, bromide and total alkalinity (including bicarbonate, carbonate and total alkalinity) plus a measurement of total dissolved solids.
EngineerForm: (04)
400965301
01/12/2016
1) The additional cement referenced shall be placed as indicated and comply with Rule 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. 2) Please submit gyro survey data with Form 5 Drilling Completion Report.
EngineerForm: (04)
403369937
04/24/2023
Operator will successfully pressure test the tubing / casing annulus to a minimum of 300 psi, for a minimum of 15 minutes. If the pressure test fails, contact COGCC engineering before continuing operations .
EngineerForm: (04)
403480948
09/22/2023
All placed cement shall be verified with a CBL and documented with a Form 5.
OGLAForm: (06)
403883324
08/19/2024
This planned location is located within a bald eagle buffer. Operations will need to be completed outside the timing windows of 12/1 – 7/31 (eagle nest) and/or 11/15 – 3/15 (winter night roost). The eagle nest buffer window can be shortened if the nest has been confirmed fledge for the year by CPW. If work, is planned during either window, HSE will consult with CPW prior to operations beginning.
OGLAForm: (06)
403883324
08/19/2024
Due to close proximity to Residential Building Units (RBUs), prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of the RBUs nearby and adjacent to the parcel with the well. The sheet will include the operator's contact information and the nature, timing, and expected duration of the P&A operations. Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors, odors and noise from plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
OGLAForm: (06)
403883324
08/19/2024
Due to proximity to a mapped wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water. 
EngineerForm: (06)
403883324
08/21/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Prior to placing cement above the base of the Upper Pierre (1260') : verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) Pump surface casing shoe plug only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 720’ or shallower and provide a minimum of 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
403883324
08/21/2024
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06)
403883324
08/21/2024
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
403883324
08/21/2024
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. If there is a need for sampling, contact ECMC engineering for verification of plugging procedure.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
403369937
4/24/2023
Operations are daylight-only; no lighting impacts are anticipated from operations.
Community Outreach and NotificationForm: (04 )
403369937
4/24/2023
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
403369937
4/24/2023
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard
WildlifeForm: (04 )
403369937
4/24/2023
Between 12/1 through 4/30, KMOG will only perform rig operations during daylight hours, Monday through Friday. KMOG access roads have speed limit restrictions that all personnel will follow. KMOG will shut down operations if an extreme winter storm is anticipated.
WildlifeForm: (04 )
403369937
4/24/2023
This planned location is located within a bald eagle buffer. Operations will need to be completed outside the timing windows of 12/1 – 7/31 (eagle nest) and 11/15 – 3/15 (winter night roost). The eagle nest buffer window can be shortened if the nest has been confirmed fledge for the year by CPW. If work, is planned during either window, HSE will consult with CPW prior to operations beginning. CPW consultation has been completed.
Dust controlForm: (04 )
403369937
4/24/2023
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403369937
4/24/2023
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units
PlanningForm: (04 )
403480948
9/22/2023
Operations are daylight-only; no lighting impacts are anticipated from operations.
Community Outreach and NotificationForm: (04 )
403480948
9/22/2023
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard
Community Outreach and NotificationForm: (04 )
403480948
9/22/2023
Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
WildlifeForm: (04 )
403480948
9/22/2023
Mule Deer (MD): Between 12/1 through 4/30, KMOG will only perform rig operations during daylight hours, Monday through Friday. KMOG access roads have speed limit restrictions that all personnel will follow. KMOG will shut down operations if an extreme winter storm is anticipated.
WildlifeForm: (04 )
403480948
9/22/2023
This planned location is located within a bald eagle buffer. Operations will need to be completed outside the timing windows of 12/1 – 7/31 (eagle nest) and 11/15 – 3/15 (winter night roost). The eagle nest buffer window can be shortened if the nest has been confirmed fledge for the year by CPW. If work, is planned during either window, HSE will consult with CPW prior to operations beginning.
Dust controlForm: (04 )
403480948
9/22/2023
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403480948
9/22/2023
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.