| Engineer | Form: (06) 400534180 01/07/2014 | Note changes to plugging procedure:
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 1010’ plug: pump plug and displace. If surface casing plug not circulated to surface then tag plug – must be 550’ or shallower. Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|