Engineer | Form: (06 ) 401446959 11/17/2017 | Prior to starting plugging operations a bradenhead test shall be performed.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test. |
Engineer | Form: (06 ) 401446959 11/17/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103.
3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
4) Operator should review production reporting and determine if the J-sand production reports need corrected. This zone was reported as TA Oct. 2010, but started reporting production in 2015.
5) Submit gyro survey data with Form 6 Subsequent Report of Abandonment.
6) Production casing stub plug is also surface casing shoe plug, this plug must be tagged at 565’ or shallower. Leave at least 100’ of cement in the wellbore for each plug. |