Engineer | Form: (06 ) 400834184 6/19/2015 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) If unable to pull casing contact COGCC for plugging modifications.
3) For 1560' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 472’ or shallower.
4) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
5) Please submit existing gyro survey data with Form 6 (s) Subsequent Report of Abandonment. |
Engineer | Form: (06 ) 401396653 12/12/2017 | Prior to starting plugging operations a bradenhead test shall be performed.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. |
Engineer | Form: (06 ) 401396653 12/12/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon all flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
4) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment.
5) Production casing stub plug is also surface casing shoe plug, this plug must be tagged at 819’ or shallower. Leave at least 100’ of cement in the wellbore for each plug. |