Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-19627HILL
31-9-11
STRACHAN EXPLORATION INC
83130
PA
9/5/2018
BIRD HAVEN
6765
WELD  123
NESE 31 8N60W 6
330786View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401600589
5/10/2018
1) Provide 48 hour notice of MIRU via electronic Form 42. 2) Dump bail 2 sks cement on existing CIBP at 6986'. 3) Shoe plug: Tag plug 50’ above surface casing shoe. 4) Surface plug: Cement from 50' to surface in casing and annulus. 5) Properly abandon flowlines per Rule 1103. File Form 42 when done.
EngineerForm: (06 )
401600589
5/10/2018
Bradenhead: 1) If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations a Bradenhead test shall be performed. The Form 17 shall be submitted within 10 days of the test. 2) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 3) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
 
COGIS - Best Management Practice Results
No records to display.