Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-19603HSR-ARISTOCRAT
13-27A
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
1/11/2017
WATTENBERG
90750
WELD  123
SESE 28 2N66W 6
311413View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401093192
08/28/2016
1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Please submit referenced gyro survey data from 11/18/2013 with Form 6 (s) Subsequent Report of Abandonment. 5) Stub plug is also shoe plug, this plug must be tagged at 910’ or shallower. Leave at least 100’ cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.