| Engineer | Form: (04) 400500269 11/12/2013 | Need gyro submitted with Drilling Completion Report. |
| Engineer | Form: (06) 401632621 10/10/2018 | Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
If there is a need for sampling, contact COGCC engineering for verification of plugging procedure. |
| Engineer | Form: (06) 401632621 10/10/2018 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
4) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment. |
| Engineer | Form: (04) 402034075 05/08/2019 | This approval is good for one year and a new application must be made before June 1, 2019. Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402063222 06/20/2019 | This approval is good for one year and a new application must be made before July 03, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402396578 05/28/2020 | This approval is good for one year and a new application must be made before May 12, 2021. Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402396578 05/28/2020 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |