Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-18689VESSELS MINERALS &
39;E&
39;
1
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PA
11/13/2017
WATTENBERG
90750
ERIE/WELD  123
NWSW 19 1N68W 6
335664View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06 )
401422788
10/17/2017
Please file an updated 5A for the Codell interval and the refrac in 2007.
EngineerForm: (06 )
401422788
11/4/2017
If there is a Bradenhead pressure greater than 25 psi indicated on the Bradenhead test, the plug at 2300’ needs to be placed and have an 8 hour WOC to assure that all fluid migration has been stopped. If that doesn’t isolate the flow, additional attempts in front of the surface shoe plug will need to be attempted.
EngineerForm: (06 )
401422788
11/4/2017
Prior to starting plugging operations a bradenhead test shall be performed. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06 )
401422788
11/4/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.