| Engineer | Form: (02) 2588133 08/26/2011 | 1) Provide 48 hour notice of MIRU to Jim Precup at 303-726-3822 or e-mail at jim.precup@state.co.us.
2) Within 30 days after recomplete, submit a Form 5A to document the new status of both formations in accordance with Rule 308B. If the casing pressure test indicates the need for remedial cement, provide a Form 5 with a CBL to document any remedial cement provided in accordance with Rule 308A (change of wellbore configuration).
|
| Engineer | Form: (06) 400921083 11/04/2015 |
Note changes to plugging procedure:
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 595’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 396’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|