Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-17258KUGEL V
18-5
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
6/19/2017
WATTENBERG
90750
FIRESTONE/WELD  123
SWNW 18 2N67W 6
336385View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401270609
05/01/2017
1) Prior to starting repair work a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements before pumping any cement. The Form 17 shall be submitted within 10 days of the test. 2) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5. Submit gyro survey data with the Form 5.
 
COGIS - Best Management Practice Results
No records to display.