Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-17081MARRS RED
VV 22-2DX
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
5/17/2019
WATTENBERG
90750
WELD  123
SWNW 22 1N67W 6
329263View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400931370
01/19/2016
Note changes to plugging procedure: 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 1350’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 744’ or shallower and provide 25 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
PermitForm: (06)
401840584
11/15/2018
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days -Production is missing from 3/2014 and 5/2014
EngineerForm: (06)
401840584
02/27/2019
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
EngineerForm: (06)
401840584
02/27/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401840584
02/27/2019
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines per Rule 1105. File electronic Form 42 once abandonment of on-location flowlines complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment. 4) Tag existing CIBP at 8175’ to confirm there. If CIBP is not tagged where expected contact COGCC Engineer to update plugging orders.
 
COGIS - Best Management Practice Results
No records to display.