| Engineer | Form: (06) 401289644 06/21/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
3) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment.
4) Production casing stub plug is also surface casing shoe plug, this plug must be tagged at 709’ or shallower. Leave at least 100’ of cement in the wellbore for each plug. |