COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400746824
12/12/2014
Note changes to plugging procedure: 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 1250’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 343’ or shallower and provide 25 sx plug at the surface. Leave at least 100’ cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.