WELL05-123-13769OCOMA C
17-10
NOBLE ENERGY INC
100322
PA
9/11/2020
WATTENBERG
90750
WELD  123
NWSE 17 4N64W 6
326850View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401968779
03/13/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401968779
03/13/2019
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 620' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 246' or shallower and provide 10 sack plug at surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44.
EngineerForm: (06)
401968779
03/13/2019
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for a confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (04)
402312451
03/06/2020
This approval is good for one year and a new application must be made before February 27, 2021. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402312451
03/06/2020
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402312451
03/06/2020
Please update production reporting from July, 2019 to present to reflect TA status and not SI.
EngineerForm: (04)
402312451
03/06/2020
Submit a Form 5A, as soon as possible, indicating when and how the well was TA’d.
 