COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401423618
11/07/2017
Operator shall submit a written safety plan applicable to all location(s) undergoing plugging operations in Colorado, by email to Mike Leonard at mike.leonard@state.co.us. The safety plan shall describe the measures Operator will implement at the location(s) to eliminate unnecessary and excessive venting or flaring of natural gas, to protect the health and safety of the public, and to ensure that odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401423618
11/07/2017
Prior to starting plugging operations a bradenhead test shall be performed. 1)If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2)If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3)If sampling is required contact COGCC engineering for a confirmation of plugging requirements prior to placing any plugs. 4)Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06)
401423618
11/07/2017
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Prior to placing the 750’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging requirements. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours and tag plug – top of plug must be not deeper than 270’ and provide minimum 10 sx plug at the surface. Leave at least 100’ of cement in the wellbore for each plug. 4) Properly abandon flowlines. Once flowlines are properly abandoned, file electronic form 42.
 
COGIS - Best Management Practice Results
No records to display.