Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-12614WILLIAM H PELTIER
2
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PA
12/5/2017
STAGE STOP
79130
ERIE/WELD  123
NENW 20 1N68W 6
323142View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401217567
3/10/2017
1) Operator must submit production and bradenhead samples. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples in an approved electronic data deliverable format. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Submit referenced CBL with Form 6 Subsequent Report of Abandonment. 5) If plug on CICR at 1830' is not circulated to surface then tag plug – must be 200’ or shallower and provide a 15 sack plug at the surface. Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.