Engineer | Form: (04 ) 401604288 5/24/2018 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1. Within 60 days prior to recompletion
2. Within 60 days after recompletion
|
Engineer | Form: (04 ) 401604288 5/24/2018 | Recomplete cannot be performed without an approved Form 2.
1) Prior to recomplete provide remedial cement to isolate the aquifer from 1261’ to at least 50’ above the surface casing shoe. Verify cement with a CBL and document with a Form 5.
2) Completed Interval Report, Form 5A, shall be submitted within 30 days after Recompletion. |
Engineer | Form: (02 ) 401554364 5/24/2018 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1. Within 60 days prior to adding cement and recompletion
2. Within 60 days after recompletion |
Engineer | Form: (02 ) 401554364 5/24/2018 | 1) Prior to recomplete provide remedial cement to isolate the aquifer from 1261’ to at least 50’ above the surface casing shoe. Verify cement with a CBL and document with a Form 5.
2) Completed Interval Report, Form 5A, shall be submitted within 30 days after Recompletion.
|