Engineer | Form: (04 ) 401090769 8/17/2016 | The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5. |
Engineer | Form: (04 ) 401090769 8/17/2016 | 1) Prior to initiation of repair, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days of the test.
2) Within 30 days followwing repair, an additional bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days of the test.
|
Engineer | Form: (04 ) 402006431 12/5/2019 | • Update Form 7 well status to correspond to date of TA.
• 5A, #401768550, in process with an outstanding request for additional information from the operator. Contact COGCC Permitting with response no later than 12/15/2019.
|
Engineer | Form: (04 ) 402129913 12/16/2019 | This approval is good for one year and a new application must be made before July 31, 2020. Updates for the planned utilization of the well should be included with the application. |
Engineer | Form: (04 ) 402129913 12/16/2019 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (06 ) 402515136 10/27/2020 | Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
|
Engineer | Form: (06 ) 402515136 10/27/2020 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. |
Engineer | Form: (06 ) 402515136 10/27/2020 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Prior to placing the 628’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 378’ or shallower and provide 10 sx plug at the surface.
4) Leave at least 100’ of cement in the wellbore for each plug.
5) Properly abandon flowlines per Rule 1105. File electronic Form 42 once abandonment of on-location flowlines is complete. Within 90 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed.
7) After placing the shallowest hydrocarbon isolating plug (1650'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or fluid migration, contact COGCC engineering before continuing operations.
|