Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-11377NELSON
5
TEXAS TEA OF COLORADO LLC DBA TEXAS TEA LLC
87195
PA
2/16/2015
SPINDLE
77900
FREDERICK/WELD  123
SWSW 32 2N68W 6
319505View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
2364409
09/14/2014
Note change in plugging procedures 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Add CIBP@ 4400'. 3) Run freepoint before cutting casing. If unable to pull casing below 2500' contact COGCC for plugging modifications. 4) If maintain circulation do not have to tag stub plug. 5) For 750' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 649’ or shallower. If shoe plug not circulated to surface then place 10-50 sx inside casing at surface. Leave at least 100' for each plug. 6) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 7) Submit open hole logs (not on file with COGCC) on form 4 prior to submitting form 6 (s) Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.