Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-11213UPRR 50 PAN AM "l"
TRUE 2
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
4/9/2014
WATTENBERG
90750
WELD  123
SWSE 35 2N66W 6
319411View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400484807
10/10/2013
1) Provide 24 hour notice of MIRU to Jim Precup at 303-726-3822 or e-mail at james.precup@state.co.us. 2) Leave at least 100’ cement in the wellbore for each plug. 3) For 1300' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 1082’ or shallower. 4) Properly abandon flowlines as per Rule 1103. 5) Provide Contractor records for existing CIBP with Sand Cap @ 7580' with Form 6 (S), along with Contractor records for other plugs.
 
COGIS - Best Management Practice Results
No records to display.