Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-10759BARB LTD &
39;K&
39; UNIT
1
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PA
12/8/2017
WATTENBERG
90750
ERIE/WELD  123
SESE 30 1N68W 6
319139View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
401343880
8/4/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For 1690’ plug(surface casing): pump plug and displace. If plug not circulated to surface or falls back then tag plug – must be 570’ or shallower and provide 10 sx plug at the surface. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
EngineerForm: (06 )
401343880
8/4/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
 
COGIS - Best Management Practice Results
No records to display.