Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-10756OWEN
12-1
KP KAUFFMAN COMPANY INC
46290
SI
1/1/2026
WATTENBERG
90750
WELD  123
SWSW 12 3N68W 6
319137View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
404107454
04/02/2025
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 3) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5 within 30 days of repair operations. 4) After performing remedial squeezes, operator shall pressure test the wellbore to a minimum of 500 psi for a minimum of 15 minutes. Provide a copy of the pressure test with the Form 5.
 
COGIS - Best Management Practice Results
No records to display.