Engineer | Form: (06 ) 401314041 7/27/2017 | NOTE: Changes in plugging procedure - surface plug increased to 15 sx
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|
Engineer | Form: (06 ) 401314041 7/27/2017 | Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days. |