COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401071629
07/07/2016
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For the 665’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be at 365’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Prior to initiation of plugging operations, a Bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days.
 
COGIS - Best Management Practice Results
No records to display.