Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-10551NELSON
1-A
TEXAS TEA OF COLORADO LLC DBA TEXAS TEA LLC
87195
PA
7/15/2014
SPINDLE
77900
FREDERICK/WELD  123
SWNW 32 2N68W 6
336463View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
2091162
07/08/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) If unable to pull casing contact COGCC for plugging modifications. 3) If maintain circulation do not need to tag stub plug@3424'. 4) For 751' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 660’ or shallower. If shoe plug not circulated to surface then place 10 sx inside casing at surface. Leave at least 100' for each plug. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.