LocationLocation IDRelated Facilities
WELL05-123-10422SCHLAGEL
2
EXTRACTION OIL & GAS INC
10459
PA
6/30/2018
WATTENBERG
90750
WELD  123
SWSE 17 2N68W 6
318981View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06)
401676492
06/18/2018
Requirement for compliance with Rule 309: Operator’s Monthly Report of Operations, Form 7. Form 7 reporting shall be corrected for the J Sand. The months that require correction are dependent on the tagging of the CIBP placed 12/1/2004. If CIBP is tagged, the Form 7 reporting should be TA from 12/2004 to current. If CIBP is not tagged, correction of the production reporting from 2/2015 to current is required. Submittal of a Form 7 in correction of these deficiencies is required for compliance with Rule 309 within 30 days.
EngineerForm: (06)
401676492
06/20/2018
Tag plug at 7665' set on 12/01/2004. Dump bail 2 sacks cement on plug. If plug is not there, contact COGCC engineering staff for further plugging orders
EngineerForm: (06)
401676492
06/20/2018
Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401676492
06/20/2018
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Prior to placing the 729’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 479’ or shallower and provide 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug. 5) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44.
EngineerForm: (06)
401676492
06/20/2018
If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. 3) If sampling is required contact COGCC engineering for an confirmation of plugging requirements prior to placing any plugs. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
 
COGIS - Best Management Practice Results