Engineer | Form: (04 ) 400789958 2/11/2015 | 1) The additional cement referenced shall be placed as indicated and comply with Rule 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report.
2) Verify successful casing repair with a casing pressure test and report pressure test results in the Form 5 under Submit tab Technical Details/Comments. |