Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-10062ROCKY MTN FUEL CO UNIT G
2
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
7/16/2014
WATTENBERG
90750
WELD  123
CNW 9 1N67W 6
318831View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400560619
2/24/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2)No CBL on file. Run CBL to verify the top of primary cement is at least 200’ over Niobrara, at least 50’ below Sussex to 50’ above Sussex, and adequately isolates the Fox Hills aquifer. If it does not exist as required, provide this coverage as part of this plugging project. Use CBL results to verify the setting depth of and stage cement pumped through the DV tool. Add cement, as needed, to provide cement from 660’ to at least 50’ within the surface casing shoe. 3) Leave at least 100’ cement in the wellbore for each plug. 4) For 1412' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 240’ or shallower. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 6) Please submit gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.