Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09996ERICA
1
PDC ENERGY INC
69175
PA
3/4/2014
WATTENBERG
90750
FORT LUPTON/WELD  123
NWNW 34 2N66W 6
318813View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
400529810
1/28/2014
Note change in plugging procedure: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Add CIBP @7100' with 2 sacks cement on top. 3) Change plug depth from proposed (1200' to 900') to 1200' to 740' to cover DV tool @791'. Adjust cement volumes accordingly. Pump plug and displace, wait 4 hours and tag plug. 4) Perforate @ 350' and pump 50 sacks to isolate Arapahoe and Fox Hills aquifers. If surface casing plug not circulated to surface then tag plug – must be 150’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ cement in the casing for each plug. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 6) Provide an “As Plugged” wellbore diagram identifying the specific plugging completed.
 
COGIS - Best Management Practice Results
No records to display.