| Engineer | Form: (06) 400476425 09/30/2013 | Please note changes to plugging procedure.
1) Provide 24 hour notice of MIRU to Jim Precup at 303 726-3822 or e-mail at james.precup@state.co.us
2) For 1030’ plug: pump plug and displace, if not circulated to surface, tag plug, must be 230’ or shallower. Leave at least 100’ cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. |