Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09790EDITH H. WHITESIDE
1
PDC ENERGY INC
69175
PA
7/16/2017
WATTENBERG
90750
BRIGHTON/WELD  123
SWSW 20 1N66W 6
318716View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401147667
12/01/2016
1) Prior to starting plugging operations a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Submit referenced CBL with Form 6 (s) Subsequent Report of Abandonment. If plugging procedure needs to be adjusted based on CBL contact COGCC engineer. 5) If surface casing shoe plug is not circulated to surface then tag plug- must be 167' or shallower and provide a 10 sack plug at the surface.
 
COGIS - Best Management Practice Results
No records to display.