Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09425UPRR 42 PAN AM AQ
1
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
8/13/2014
WATTENBERG
90750
WELD  123
NWSW 17 2N66W 6
318574View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400567740
03/19/2014
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) No CBL on file. Run CBL to verify the top of primary cement is at least 200’ over Niobrara, at least 50’ below Sussex to 200’ above Sussex, and adequately isolates the Fox Hills aquifer. If cement does not exist as required, provide this coverage as part of this plugging project. Use CBL results to verify the stage cement pumped from 715' to 405'. If cement missing, add cement behind production casing or cut casing deeper and add cement to ensure Fox Hills aquifer isolation. 3) If unable to pull casing contact COGCC for plugging modifications. 4) For 380' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 209’ or shallower. 5) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.