Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-08835FEHRN
1-28
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
11/10/2017
WATTENBERG
90750
WELD  123
SWSW 28 2N66W 6
318290View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
400813328
04/03/2015
Note change in plugging procedure: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) For 1610' plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 506’ or shallower to isolate Laramie Fox Hills aquifer from shallower Lower Arapahoe aquifer. Increase cement volumes accordingly. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Please submit existing gyro survey data with Form 6 (s) Subsequent Report of Abandonment.
EngineerForm: (06)
401255411
04/14/2017
1) Prior to starting plugging operations a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results
No records to display.