PA
1/4/2019
WATTENBERG
90750
WELD  123
NENE 34 2N65W 6
318208View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02)
2557625
06/14/2010
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us. 2) No CBL on file documenting the stage cement indicated from 986’ up on permit. Run and submit CBL to verify cement coverage. Required coverage is at least 980’ to 180’ (50’ below Fox Hills aquifer to 50’ above shoe). Contact COGCC for remedial requirements if actual coverage is less.
AgencyForm: (02)
2557625
06/23/2010
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us. 2) No CBL on file documenting the stage cement indicated from 986’ up on permit. Run and submit CBL to verify cement coverage. Required coverage is at least 980’ to 180’ (50’ below Fox Hills aquifer to 50’ above shoe). Contact COGCC for remedial requirements if actual coverage is less.
PermitForm: (06)
401773462
10/04/2018
COA: CODL reported twice in production reporting from Aug '10-Mar '12 after already being commingled. Remove CODL panel. Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 309 within 30 days.
EngineerForm: (06)
401773462
11/16/2018
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
EngineerForm: (06)
401773462
11/16/2018
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. 4) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment.
 